Los proyectos de regulación de los ríos Júcar y Turia (1928-1964). Una nueva lectura
DOI:
https://doi.org/10.7203/CGUV..14207Resumen
This paper analyses the joint planning process the Jucar and Turia rivers regulation, in order to identify the causes of the most significant technical errors. The planning process started during the Primo de Rivera dictatorship, but the definitive proposals were settled after the Civil War, in 1955, in the Júcar and Turia Regulation Project. These plans, never accepted by local stakeholders and economic agents, completely ignored the potential of groundwater resources and failed in the assessment of water resources, causing the over-dimensioning of some critical infrastructures.Descargas
Descargas
Cómo citar
-
Resumen207
-
PDF303
Número
Sección
Licencia
Los autores y autoras ceden a la revista Cuadernos de Geografía de la Universitat de València los derechos de reproducción en revistas científicas de los textos publicados. Asimismo, permiten al equipo de CGUV distribuir estos contenidos, además de en el sitio electrónico de CGUV, en todas aquellas bases de datos científicas en la que se encuentre indexada ésta, siempre con el objetivo de asegurar una amplia distribución de los contenidos cedidos por los autores.
Apostando por un firme compromiso con las políticas de contenidos en abierto e intentando garantizar la máxima difusión de los trabajos publicados, las personas autoras mantienen todos los derechos de copyright. Podrán reproducir y distribuir sus obras en otras publicaciones. No obstante, se recomienda mencionar en el nuevo texto que este ha sido previamente publicado en CGUV, adjuntando una cita completa al mismo.
Los textos publicados en esta revista están –si no se indica lo contrario– bajo una licencia de Creative Commons: Reconocimiento-NoComercial-SinObraDerivada 4.0 Internacional. La licencia completa se puede consultar en Creative Commons